Bienvenue sur le site de Racem MELLOULI
|
| Acceuil | Formation & parcours
professionnel | Recherche
& Publications | Enseignement | Liens | CV |
|
Applications
(problèmes):
- Production : ordonnancement (scheduling), problèmes de
découpe et placement (cutting /packing).
- Logistique : conception de réseaux (network design),
localisation d'entrepôts (facility location), planification des stocks
et des flux (inventory and flow planning), tournées de
distribution (VRP).
Revues
R. Mellouli, I. Kacem, C. Sadfi, C. Chu, "Lagrangian
relaxation and column generation-based lower bounds for the Pm,hj1||sum WiCi
scheduling problem", Journal of Applied Mathematics and Computation,
DOI: 10.1016/j.amc.2013.05.004 (to appear 2013).
N. Chaabane, R. Mellouli, F. Masmoudi, "Evolutionary
Metaheuristic Based on Genetic Algorithm: Application to Hybrid Flow Shop
Problem with Availability Constraints", Book Chapter. Metaheuristics for Production Scheduling – Wiley, ISBN:
9781848214972 (to appear 2013).
N.
Chaabane, R. Mellouli, F. Masmoudi,
"Métaheuristique évolutionnaire à base d’algorithme génétique: application
au problème Flow-Shop Hybride en présence d’indisponibilités", Book Chapter. Métaheuristiques pour
l'ordonnancement de la production - HERMES (to appear 2013).
A.
Chbichib, R. Mellouli, H. Chabchoub,
"Profitable Vehicle Routing Problem with Multiple Trips: Modeling and
Variable Neighborhood Descent Algorithm", American Journal of
Operational Research, Volume 2, number 6, pages 104-119 (2012). [Lien Scientific &
Academic Publishing]
N. Chaabane, R. Mellouli, F. Masmoudi, C. Chu,
"MILP methods for the S-stage Flexible Flow Shop scheduling problem",
International Journal of Modelling in
Operations Management. Volume 2, number 2, pages 138-152 (2012). [Lien Inderscience]
R. Mellouli, C. Sadfi, C. Chu, I. Kacem, "Identical
Parallel-machine scheduling with availability constraints to minimize the sum
of completion times", European Journal of operational research. Volume
197, issue 3, pages 1150-1165 (2009). [Lien ScienceDirect Elsevier]
Proceedings IEEE
H. Zribi, R. Mellouli, I. Kacem, "Lower bounds and an enhanced greedy
heuristic for the single processor scheduling with release dates",
Proceedings IEEE, International Conference on Control, Decision and Information
Technologies (CoDIT’13), May 6-8, Hammamet Tunisia, 7 pages (2013).
F. Maalla, R. Mellouli, H. Chabchoub, "A new realistic modeling approach
for two-echelon logistics network design", Proceedings IEEE, 5th
International Conference on Modeling, Simulation and Applied Optimization
(ICMSAO’13), April 28-30, Hammamet Tunisia, 6 pages (2013).
A. Chbichib, R. Mellouli, H. Chabchoub,
"Profitable Vehicle Routing Problem with Multiple Trips: modeling and
constructive heuristics", Proceedings IEEE, 4th
International Conference on Logistics “LOGISTIQUA”, May 31 - June 3, Sousse Tunisia,
8 pages (2011). [Lien
ieeeXplore]
R. Mellouli, C. Sadfi, C. Chu, I. Kacem, "Branch-and-bound
method t solve the parallel-machine scheduling problem with availability constraints",
Proceedings IEEE, International
conference of service system and service management, ICSSSM'06, october 25-27,
Troyes France, 7 pages (2006). [Lien ieeeXplore]
R. Mellouli, C. Sadfi, C. Chu, I. Kacem, "MSPT2 heuristic
and dynaic programming method for the parallel machine scheduling problem with
scheduled preventive maintenance", Proceedings
IEEE, International conference of service system and service management,
ICSSSM'06, october 25-27, Troyes France, 6 pages (2006).
[lien ieeeXplore]
R. Mellouli, C. Sadfi, C. Chu, I. Kacem, "Column genration
method to solve the parallel machine scheduling problem with availability
constraints", Proceedings IEEE, International
conference of computational engineering in system applications, CESA'06, october 4-6, Beijing, China, 7 pages (2006). [Lien ieeeXplore]
Conférences
N. Chaabane, R. Mellouli, F. Masmoudi, C. Chu,
" Metaheuristic for S-stage Flexible Flow Shop
scheduling problem with availability constraints", 4th International
Conference on Metaheuristics and Nature Inspired Computing, META’2012, 27-31
October, Sousse Tunisia, 2 pages (2012).
A. Chbichib, R. Mellouli, H. Chabchoub, "A
Variable Neighborhood Descent Heuristic for the Profitable Vehicle Routing
Problem with Multiple Trips", 4th International Conference on Metaheuristics
and Nature Inspired Computing, META’2012, 27-31 October, Sousse Tunisia, 2 pages (2012).
A. Chbichib, R. Mellouli, H. Chabchoub, "A
Profitable Vehicle Routing Problem with Multiple Trips: Models, Solution
Approaches and Case study", 5th research days “recherche opérationnelle
et aide à la decision” ROAD-2012, 10-11 October, Djerba Tunisia, 6 pages (2012).
H. Zribi, R. Mellouli, I. Kacem, "Scheduling with release dates on a
single machine to minimize total weighted completion time", 5th research
days “recherche opérationnelle et aide à la decision” ROAD-2012, 10-11 October,
Djerba Tunisia, 6 pages (2012).
M. Baazaoui, R. Mellouli, H. Chabchoub, "A new
heuristic for the integrated problem of cutting and sizing of 3D-bins", 9th
International Conference on Computational Management Science, 18-20 April, London England, 1 page (2012).
A. Chbichib, R. Mellouli, H. Chabchoub,
"Comparing iterated local search procedures to solve the profitable
vehicle routing problem with multiple trips", the 25th Conference of
European Chapter on Combinatorial Optimization, April 26 – 28, Antalya Turkey, 8 pages (2012).
R. Mellouli, "Modeling the parallel-machine scheduling under availability
constraints", International Conference on Operations Research and
Financial Engineering, 24-26 June, Paris France, 6 pages (2011).
N. Chaabane, R. Mellouli, F. Masmoudi, C. Chu,
"S-stage Flexible Flow Shop scheduling with availability
constraints", International Conference on Operations Research and
Financial Engineering, 24-26 June, Paris France, 5 pages (2011).
R. Mellouli, C. Sadfi, C. Chu, "MILP methods for
parallel-machine scheduling under availability constraints", 9th
Multi-Objective Programming and Goal Programming 2010 MOPGP10, May 24-26,
Sousse Tunisia, 1 page (2010).
A. Mellouli, F. Masmoudi, I.
Kacem, R. Mellouli, M. Haddar, "A Optimisation of Two-dimensional
Cutting-stock Problem", 39th International Conference on Computers
& Industrial Engineering CIE39, July 6-8,
R. Mellouli, C. Sadfi, C. Chu, "A lagrangian
relaxation-based lower bound for the Pm,hj1||sum WiCi scheduling problem",
Logistic & transport'07, November 19-21, Sousse Tunisia, 8 pages (2007).
R. Mellouli, C. Sadfi, C. Chu, I. Kacem, "Tree search-based
heuristic and genetic algorithm method for the Pm,hj1||sum Ci scheduling
problem", 1st International workshop of the group META, MATA'06,
November 2-4, Hammamet, Tunisia, 2 pages (2006).
R.
Mellouli,
C. Sadfi, I. Kacem, C. Chu, "Ordonnancement sur machines parallèles avec
contraintes d'indisponibilité", 6è conférence francophone de
modélisation et simulation, MOSIM'06, April 3-5, Rabat Maroc, 8 pages (2006).
Rapports
techniques et papiers en cours de préparation
R. Mellouli, I. Kacem, "The capacitated-parallel machine
scheduling to minimize the sum of completion times", en cours.
R. Mellouli, "Modeling the parallel-machine scheduling under
availability constraints", en cours.
R. Mellouli, N. Hadj Taieb, P-P. Dornier, "A real case logistics
master plan by solving a location-allocation problem", en cours.
R. Mellouli, "A Linear Bounding-based Branch-and-Bound for
Parallel-Machine Scheduling Under Availability Constraints", en cours.
R.
Mellouli,
"Ordonnancement sur machines parallèles sous contraintes
d'indisponibilité", mémoire de thèse soutenue le 18 décembre 2007 à
l’UTT.
R. Mellouli, C. Sadfi, C. Chu, "On the capacitated-parallel
machine scheduling to minimize the sum of completion times", UTT,
Novembre 2007.
R.
Mellouli,
"Ordonnancement sur machines parallèles sous contraintes
d'indisponibilité", poster, doctoriale de l'UTT, 22 mai 2006.
Encadrements en mastères de recherche
Ali Louati, M2R
en ROGP à la FSEG Sfax, inscription en octobre 2011: soutenue
le 13 avril 2013
Thème: Problèmes
de tournées de véhicule.
Sujet: «Modèles réalistes pour
un problème riche de tournée combinée de livraison et de collecte »
Fatma Maalla, M2R en ROGP à la FSEG Sfax, inscription en octobre
2010 (co-encadrement de Pr Habib Chabchoub): soutenue
le 03 juillet 2012
Thème: Conception
de la chaine logistique.
Sujet: «Une nouvelle approche
réaliste de modélisation des problèmes de conception de réseaux logistiques :
cas de réseaux à deux échelons».
Mariem Baazaoui,
M2R en ROGP à la FSEG Sfax, inscription en octobre 2010 (co-encadrement de Pr
Habib Chabchoub): soutenue le 11 janvier 2012
Thème: Problèmes
de découpe et de placement.
Sujet: «Problème combiné de
découpe et de dimensionnement 3D: cas réel ».
------------------------------------------------------------------------------------------------------------------------------------------------
Nawel Krichen,
M2R en STL à l’ISGI Sfax, inscription en octobre 2010: en
cours
Thème: Problèmes
de tournées de véhicule/ Logistique inverse.
Sujet: «Une métaheuristique
hybride pour l’optimisation des programmes de tournées de collecte de déchets
multidépots avec ressources décentralisées: cas du Grand Sfax».
Hejer Zribi, M2R
en I2M à l’ISIM Sfax, inscription en octobre 2011 (co-encadrement de Pr Imed
Kacem): en cours
Thème: Ordonnancement.
Sujet: «Ordonnancement
monoprocesseur avec différentes dates d’arrivée des tâches pour minimiser le
temps moyen pondéré de séjour».
Accompagnements dans l’encadrement de thèses de doctorat
Nadia Chaabane,
PhD en GI à l’ENIT Tunis, inscription en janvier 2010 (codirection de Pr Faouzi
Masmoudi & Pr Chengbin Chu): en cours
Thème: Ordonnancement.
Sujet: «Ordonnancement série
avec contraintes d’indisponibilité».
Ahlem Chbichib,
PhD en MQ (RO) à la FSEG Sfax, inscription en octobre 2009 (direction de Pr
Habib Chabchoub): en cours
Thème: Problèmes
de tournées de véhicule.
Sujet: «Problème de tournée de
véhicule profitable avec voyages multiples».
Dernière mise à jour